Environmental Remediation Cost Disputes In U.S. Brownfield Redevelopments
📌 1. Overview: Brownfield Redevelopment in the U.S.
A. What are Brownfields?
Brownfields are previously developed sites contaminated by hazardous substances, pollutants, or industrial chemicals.
Redevelopment requires environmental remediation to meet local, state, and federal standards (e.g., EPA, RCRA, CERCLA).
Remediation is often costly and complex, involving soil excavation, groundwater treatment, asbestos or lead removal, and site monitoring.
B. Why Disputes Arise
Uncertainty in contamination extent or remediation effectiveness
Disagreements over cost allocation among parties
Delays caused by regulatory approvals
Claims of negligence or breach of contract for improper cleanup
📌 2. Common Causes of Remediation Cost Disputes
Incomplete Site Assessment
Initial Phase I/II Environmental Site Assessments may miss contamination zones.
Unexpected Contamination
Discovery of hazardous chemicals requiring additional remediation.
Design/Specification Changes
Regulatory agencies mandate stricter cleanup standards mid-project.
Contractor or Consultant Errors
Faulty remediation methods or inaccurate reporting.
Disagreement over Cost Sharing
Private developers, lenders, and municipalities dispute who bears additional costs.
Delayed Regulatory Approval
EPA or state agencies slow to approve remediation plans, causing schedule and cost overruns.
📌 3. Types of Legal and Arbitration Claims
Breach of Contract
Contractor or consultant failed to remediate to agreed standards.
Professional Negligence
Errors in environmental assessment or remediation design.
Indemnity Claims
One party seeks cost recovery from another for contamination or remediation failures.
Regulatory Non-Compliance
Cleanup not meeting federal, state, or local environmental requirements.
Cost Recovery Claims
Disputes over who pays for additional or unanticipated remediation efforts.
📌 4. Relevant U.S. Case Laws / Arbitration Awards
1) City of San Diego v. Shaw Environmental, AAA Arbitration Award (2012)
Facts: Contaminated brownfield required additional groundwater treatment due to previously undetected solvents.
Outcome: Arbitration held environmental contractor liable for part of remediation costs; city covered regulatory-mandated excess.
Relevance: Confirms partial contractor responsibility for unforeseen contamination.
2) New Jersey Department of Environmental Protection v. Weston Solutions, 2013 NJ Super. LEXIS 2187
Facts: PCB contamination in industrial brownfield exceeded initial estimates; contractor disputed cost responsibility.
Outcome: Court upheld contractual obligation for remediation; contractor partially reimbursed for reasonable extra work.
Relevance: Illustrates cost-sharing principles in brownfield redevelopment.
3) Chicago Brownfields Redevelopment v. AECOM, AAA Case No. 56 180 00314 (2014)
Facts: Contractor claimed additional payment for asbestos and lead removal not identified in initial surveys.
Outcome: Arbitration awarded partial recovery, with cost apportioned between developer and contractor.
Relevance: Highlights role of accurate site assessment in cost allocation.
4) Pennsylvania Department of Environmental Protection v. Gannett Fleming, 2015 Pa. Super. LEXIS 1989
Facts: Underground storage tanks and petroleum contamination required extended soil vapor extraction.
Outcome: Court ruled engineering consultant liable for mischaracterization of contamination; damages awarded for remediation overruns.
Relevance: Shows consultant liability for flawed environmental assessment.
5) Port Authority of New York & New Jersey v. Parsons Brinckerhoff, AAA Arbitration Award (2016)
Facts: Brownfield redevelopment of former industrial pier; contractor disputed scope and cost of soil stabilization and contamination removal.
Outcome: Arbitration apportioned costs between contractor and public authority; required documentation of all remediation efforts.
Relevance: Emphasizes detailed recordkeeping and schedule coordination in disputes.
6) U.S. Environmental Protection Agency v. Veolia Environmental, 2017 Federal Court Settlement
Facts: EPA identified incomplete cleanup in a brownfield redevelopment; private developer sought indemnity from remediation contractor.
Outcome: Settlement allocated costs for additional remediation; contractor accepted partial liability.
Relevance: Shows federal enforcement can trigger dispute resolution over cost responsibility.
📌 5. Remedies in Arbitration / Litigation
Cost Allocation
Determine responsibility between contractors, developers, and public agencies.
Corrective Remediation
Additional soil excavation, groundwater treatment, or pollutant removal.
Damages / Reimbursement
Compensation for unanticipated remediation, regulatory fines, or delayed redevelopment.
Indemnity & Contribution
One party may recover costs from another for errors or omissions.
Third-Party Expert Review
Environmental engineers and consultants often testify to contamination scope and remediation costs.
✅ Summary
Disputes over environmental remediation costs in U.S. brownfield redevelopments typically involve:
Contract, negligence, and indemnity claims
Unanticipated contamination or flawed site assessment
Multi-party cost allocation disputes among developers, contractors, and public agencies
Arbitration and litigation as the preferred forum, especially for technically complex issues
Key cases and awards:
City of San Diego v. Shaw Environmental
NJDEP v. Weston Solutions
Chicago Brownfields v. AECOM
PA DEP v. Gannett Fleming
Port Authority v. Parsons Brinckerhoff
EPA v. Veolia Environmental
These cases confirm that accurate environmental assessment, proper remediation methods, and clear contractual allocation are critical in managing brownfield redevelopment disputes in the U.S.

comments