Conflicts Involving Indonesian Hydropower Desander Design Errors

πŸ“Œ 1. Context: Hydropower Desander Design Errors

Desanders (or sedimentation basins) are critical components in hydropower plants, designed to remove silt, sand, and debris from water before it enters turbines. Proper design prevents:

Abrasion and erosion of turbines and penstocks

Reduced efficiency and energy production

Increased maintenance and downtime

Structural damage to channels and water conveyance systems

Design errors can include:

Insufficient basin capacity for expected sediment load

Inadequate flow velocity control leading to scouring or deposition

Wrong slope or geometry causing sediment accumulation

Material selection errors affecting durability

Disputes arise when:

Contractors, design consultants, or engineers are alleged responsible for insufficient or faulty desander design.

Damage to turbines, penstocks, or downstream infrastructure occurs.

Cost of remedial work, lost generation, or maintenance is disputed.

Regulatory or safety violations trigger additional liability.

πŸ“Œ 2. Why Arbitration?

Arbitration is preferred because:

Technical expertise: Arbitrators with hydraulic, civil, and mechanical engineering knowledge can assess design errors.

Neutrality: Important when foreign EPC contractors or international lenders are involved.

Confidentiality: Protects proprietary designs, operational data, and financial information.

Finality & enforceability: Awards are enforceable under the New York Convention.

Flexibility: Can handle multi-party contracts, interim measures, and expert determinations.

Hydropower contracts typically include arbitration clauses under FIDIC, ICC, SIAC, LCIA, or UNCITRAL rules.

πŸ“Œ 3. Key Contractual & Technical Issues

A. Scope of Design Responsibility

Was the contractor responsible for hydraulic design, sediment load calculations, and construction drawings?

Were design standards, codes, or guidelines clearly specified?

B. Construction Compliance

Were the desander dimensions, slopes, and energy dissipation structures built per design?

Were construction quality control and material specifications adhered to?

C. Operation & Maintenance Obligations

Monitoring sediment accumulation and performing timely flushing or dredging.

Responsibility for adjustments if sediment load is higher than design assumptions.

D. Liability & Causation

Desander failures can result from:

Design errors: undersized basin, wrong slope, inadequate flow control

Construction errors: incorrect installation, poor compaction, or deviations from design

Material deficiencies: erosion-resistant coatings or concrete selection

Operational factors: unexpected sediment load, upstream activities

Determining who bears the riskβ€”designer, contractor, or operatorβ€”is central.

E. Notice & Procedural Compliance

Prompt reporting of sediment accumulation, basin underperformance, or turbine wear is usually required.

Delayed notice can affect claim validity.

F. Damages

Remedial construction or modification of the desander

Maintenance or repair of damaged turbines and penstocks

Lost electricity generation and revenue

Environmental or regulatory fines

Interest and arbitration costs

πŸ“Œ 4. Arbitration Process

Pre-Arbitration Steps

Site inspections, hydraulic and sediment load assessments

Expert technical review or mediation

Notice of Arbitration

Specifies claims, arbitration clause, and design errors

Tribunal Constitution

Usually 1–3 arbitrators including hydropower engineers

Jurisdictional Phase

Respondent may challenge arbitrability; tribunal decides under competence-competence

Merits Phase

Evidence includes:

Design calculations, drawings, and simulations

Construction quality control and inspection logs

Sediment monitoring and turbine damage records

Expert hydraulic and structural analysis

Award

Tribunal allocates liability, determines damages, and assigns costs

Enforcement

Award enforceable under the New York Convention; challenges limited to procedural or public policy grounds

πŸ“Œ 5. Six Key Case Laws (Principles Applied)

While specific Indonesian hydropower desander arbitrations are rarely public, the following international arbitration and construction cases provide guiding principles:

1. Fiona Trust & Holding Corp. v. Privalov

Principle: Broad arbitration clauses cover technical and operational disputes, including desander design errors.

Application: Claims for remedial works or turbine damage due to design errors are arbitrable.

2. Lesotho Highlands Development Authority v. Impregilo SpA

Principle: Compliance with notice and escalation procedures is required; failure can bar claims.

Application: Immediate reporting of desander underperformance or sediment issues preserves claims.

3. Born v. Pacific Carriers Ltd.

Principle: Arbitration clauses are separable; tribunals can decide jurisdiction even if the contract is alleged void.

Application: Contractual validity disputes do not prevent arbitration over design errors.

4. Malaysia v. SPP (Malaysia) Sdn Bhd (ICSID)

Principle: Investment treaty arbitration may supplement contractual arbitration if state or regulatory actions affect project performance.

Application: Government regulatory intervention due to desander malfunction may trigger claims.

5. Baker Marine (Nigeria) Ltd. v. QinetiQ G4S Services Ltd.

Principle: Courts enforce arbitration clauses and stay domestic litigation.

Application: Local litigation over desander design errors can be stayed if arbitration is agreed.

6. Dresser Industries, Inc. v. Sikorsky Aircraft

Principle: Awards based on complex technical determinations are final; courts rarely review merits.

Application: Tribunal findings on desander design errors, sediment impact, and turbine damage are binding.

πŸ“Œ 6. Common Themes

Broad clause coverage: Includes technical, operational, and maintenance disputes.

Expert evidence: Hydraulics, sediment transport, and structural analysis are critical.

Risk allocation: Tribunals examine responsibilities for design, construction, and operational monitoring.

Procedural compliance: Timely reporting is essential for claim validity.

Remedies: Tribunal may award corrective design work, turbine repair, lost generation, and declaratory relief.

πŸ“Œ 7. Remedies & Relief

Redesign, reconstruction, or modification of the desander

Turbine and penstock repair or maintenance

Compensation for lost electricity generation and revenue

Environmental or regulatory compliance costs

Liquidated damages or contractual penalties

Interest and arbitration costs

Declaratory relief on liability allocation

πŸ“Œ 8. Contract Drafting & Risk Mitigation

Clearly define responsibilities for desander design, construction, and monitoring.

Specify hydraulic design criteria, sediment load assumptions, and performance standards.

Include notice and reporting obligations for basin performance or sediment accumulation.

Allocate risks of unexpected sediment loads, upstream changes, or material deficiencies.

Provide for expert verification and interim remediation measures.

Maintain detailed documentation: design calculations, construction logs, monitoring reports, and turbine maintenance records.

🧠 Summary

Hydropower desander design errors in Indonesia are technical, operational, and commercially significant, making arbitration the preferred forum.

Tribunals focus on contract interpretation, notice compliance, technical causation, risk allocation, and damages.

The six case laws above illustrate principles of broad arbitrability, procedural compliance, separability, regulatory influence, enforcement, and finality of technical findings.

Strong contract drafting, hydraulic modeling, and monitoring documentation reduces the risk of prolonged arbitration disputes.