Renewable Energy Project Platform Foreclosure .
1. Introduction
Renewable Energy Project Platform Foreclosure is an important emerging issue in competition law, particularly in the electricity, solar energy, wind energy, green hydrogen and renewable energy infrastructure sectors.
It refers to a situation in which an undertaking controlling an important platform, digital marketplace, project-development network, electricity transmission system, energy procurement mechanism or renewable energy trading facility uses its market power to restrict or exclude competing renewable energy developers, generators, suppliers or service providers.
The central competition concern is that a dominant undertaking may control the essential commercial channels through which renewable energy projects obtain access to:
Electricity transmission and distribution networks.
Renewable energy procurement platforms.
Power Purchase Agreements (PPAs).
Renewable energy auctions and bidding mechanisms.
Project financing and investment platforms.
Electricity trading and balancing markets.
Renewable energy certificates and carbon-credit markets.
Digital platforms connecting energy producers and consumers.
For example, suppose a dominant renewable energy platform connects solar power developers with electricity purchasers. If the platform gives preferential treatment to its own solar projects, imposes discriminatory access charges on competing developers, or prevents independent generators from participating in electricity procurement auctions, it may create an unfair competitive environment.
Such conduct may constitute abuse of dominant position, particularly where it has the effect of excluding equally efficient competitors and restricting consumer choice.
Important legal distinction: There is no single established category of competition-law infringement called renewable energy project platform foreclosure. The concept is analysed using established principles concerning abuse of dominance, vertical foreclosure, essential facilities, discriminatory access, tying, exclusionary conduct and merger control. The cases discussed below include both energy-sector decisions and general competition-law judgments applicable by analogy.
2. Meaning of Renewable Energy Project Platform Foreclosure
A renewable energy project platform is a commercial or technological arrangement that facilitates the development, financing, generation, distribution, trading or procurement of renewable electricity.
Such platforms may be operated by:
Electricity generation companies.
Renewable energy project developers.
Electricity exchanges.
Transmission and distribution companies.
Digital energy marketplaces.
Government-supported renewable energy procurement agencies.
Companies operating renewable energy certification systems.
Platform foreclosure occurs when the operator uses control over the platform to disadvantage competing undertakings.
Illustrations
A. Discriminatory platform access
A dominant platform allows its affiliated solar energy projects to participate in renewable electricity auctions but imposes additional technical requirements on independent solar developers.
B. Exclusive arrangements
A platform requires renewable energy producers to sell all their electricity exclusively through its own marketplace, preventing them from dealing with competing platforms.
C. Preferential treatment
A digital renewable energy marketplace ranks its affiliated wind and solar projects above competing projects, irrespective of price, efficiency or consumer preference.
D. Infrastructure foreclosure
A dominant electricity transmission undertaking refuses or delays grid connectivity for competing renewable energy projects while providing faster connectivity to its affiliated projects.
E. Data foreclosure
A platform controls essential information about electricity demand, transmission availability, renewable energy certificates and procurement opportunities but refuses to provide competing developers with equivalent access.
F. Financial foreclosure
A dominant project financing platform conditions access to finance on the developer purchasing equipment, consultancy or project-management services from its affiliated companies.
These practices can reduce competition, discourage investment and slow down renewable energy development.
3. Legal Framework Governing Platform Foreclosure
A. Abuse of dominant position
Article 102 of the Treaty on the Functioning of the European Union (TFEU) prohibits the abuse of a dominant position within the internal market.
Examples of potentially abusive conduct include:
Imposing unfair trading conditions.
Limiting production, markets or technical development.
Applying dissimilar conditions to equivalent transactions.
Making contractual arrangements subject to unrelated supplementary obligations.
Refusing access to essential infrastructure in circumstances recognised by competition law.
B. Indian Competition Act, 2002
In India, renewable energy project platform foreclosure can be examined primarily under Section 4 of the Competition Act, 2002.
Section 4 prohibits abuse of dominant position.
Relevant provisions include:
| Provision | Relevance |
|---|---|
| Section 4(2)(a) | Imposition of unfair or discriminatory conditions or prices |
| Section 4(2)(b) | Limiting or restricting production, markets or technical development |
| Section 4(2)(c) | Denial of market access |
| Section 4(2)(d) | Supplementary obligations unrelated to the main contract |
| Section 4(2)(e) | Using dominance in one relevant market to enter or protect another relevant market |
For example, if a dominant electricity procurement platform uses its control over renewable electricity procurement to disadvantage independent solar developers, Section 4(2)(c) may become particularly relevant.
Section 3 may also apply where renewable energy developers, platform operators or other market participants enter into anti-competitive agreements, including arrangements involving exclusive distribution, refusal to deal or resale restrictions.
C. Merger control
Section 6 of the Indian Competition Act and the corresponding merger-control framework under EU competition law may become relevant where a dominant undertaking acquires a competing renewable energy platform or an important project-development business.
The competition authority must examine whether the transaction may substantially lessen competition or create or strengthen a dominant position under the applicable legal test.
4. Important Case Laws Relating to Renewable Energy Project Platform Foreclosure
The following cases provide important legal principles for analysing foreclosure in renewable energy platforms. Some concern energy infrastructure directly, while others establish general principles governing platform discrimination and exclusion.
Case 1. Oscar Bronner GmbH & Co. KG v. Mediaprint
Citation: Case C-7/97, European Court of Justice (1998).
Facts:
The dispute concerned a newspaper publisher that operated a nationwide home-delivery system. A competing newspaper publisher sought access to that distribution network.
The dominant undertaking refused to provide access.
The applicant argued that the refusal prevented it from competing effectively.
Legal issue:
Whether a dominant undertaking's refusal to provide access to infrastructure could constitute abuse of dominance.
Judgment:
The Court established strict conditions for finding an abusive refusal to provide access to infrastructure developed by a dominant undertaking for its own business.
The infrastructure must be indispensable, the refusal must be likely to eliminate all effective competition by the requesting undertaking, and the refusal must lack objective justification.
Application to renewable energy platforms:
Suppose a company operates a privately developed renewable energy trading platform connecting solar producers with industrial electricity consumers.
If competing solar developers request access, the refusal must be examined under the applicable refusal-to-deal principles.
However, the mere fact that the platform is commercially important does not automatically make it an essential facility.
Legal significance:
The case establishes that access obligations should not be imposed automatically merely because a platform is commercially successful.
It is particularly relevant when renewable energy developers seek access to privately owned platforms, databases or infrastructure.
Case 2. Slovak Telekom a.s. v. European Commission
Citation: Case C-165/19 P, Court of Justice of the European Union (2021).
Facts:
Slovak Telekom controlled important telecommunications infrastructure and imposed conditions restricting competitors' access to its network.
The European Commission investigated the company's conduct under Article 102 TFEU.
Legal issue:
Whether discriminatory or restrictive access conditions imposed by a dominant undertaking could amount to abuse of dominance.
Judgment:
The Court clarified the distinction between a complete refusal to provide access and conduct involving access that is granted on restrictive or discriminatory terms.
The strict Bronner indispensability requirements do not automatically apply to every form of abusive access restriction.
Application to renewable energy platforms:
A dominant renewable energy platform might formally allow competing developers to participate while imposing:
Higher access charges.
Unreasonable technical requirements.
Delayed project approvals.
Discriminatory data-access conditions.
Less favourable auction participation terms.
Such conduct may amount to exclusionary discrimination even though access has not been completely denied.
Legal significance:
The case is particularly useful for examining partial foreclosure and discriminatory access in renewable electricity platforms.
Case 3. Google Shopping v. European Commission
Citation: Case C-48/22 P, Court of Justice of the European Union, judgment of 10 September 2024.
Facts:
Google operated a general search engine and also provided its own comparison-shopping service.
The European Commission found that Google gave preferential positioning and display treatment to its own comparison-shopping service while disadvantaging competing comparison-shopping services.
Legal issue:
Whether a dominant digital platform could abuse its position by favouring its own services and disadvantaging competing platforms.
Judgment:
The Court upheld the relevant finding of abuse.
The judgment recognised that a dominant platform's conduct may be abusive where it departs from competition on the merits and is capable of restricting competition.
The Court also addressed the distinction between discriminatory platform conduct and the exceptional circumstances governing refusal of access to infrastructure.
Application to renewable energy platforms:
Consider a digital renewable energy marketplace that lists its own affiliated solar projects more prominently than independent solar projects.
For example:
Its own solar projects appear first in search results.
Competing wind energy projects receive less visibility.
Independent developers face less favourable ranking criteria.
Consumer enquiries are systematically directed towards affiliated producers.
This may resemble the self-preferencing conduct examined in Google Shopping.
Legal significance:
This is an important authority for examining digital platform discrimination, self-preferencing and foreclosure in renewable energy marketplaces.
Case 4. Commission v. Lithuania – Lithuanian Railways
Citation: Case C-42/21 P, Court of Justice of the European Union (2023).
Facts:
Lithuanian Railways removed a railway track that was used by a competing railway undertaking to transport goods.
The European Commission found that the removal of the infrastructure restricted the competitor's ability to operate.
Legal issue:
Whether the removal or manipulation of infrastructure by a dominant undertaking could constitute exclusionary abuse.
Judgment:
The Court upheld the central finding that the conduct could constitute an abuse of dominant position.
It recognised that exclusionary conduct can take forms other than a conventional refusal to provide access.
Application to renewable energy platforms:
A dominant renewable energy infrastructure operator might remove, disable or strategically restrict access to a transmission connection, charging facility or project interface used by competing renewable energy developers.
For example, a platform operator might alter technical arrangements so that independent wind energy producers can no longer efficiently connect their projects to the electricity network.
Legal significance:
The case demonstrates that a dominant undertaking cannot necessarily escape competition scrutiny by technically restructuring or removing infrastructure instead of expressly refusing access.
Case 5. RWE Gas Foreclosure
Citation: European Commission, Case COMP/39.402, RWE Gas Foreclosure (2009).
Facts:
RWE was active in the German gas market and controlled important gas transmission infrastructure.
The European Commission investigated concerns relating to access to gas transportation capacity and the possibility that RWE's network position restricted competing gas suppliers.
Legal issue:
Whether the control and operation of important energy transmission infrastructure could be used to foreclose competing energy suppliers.
Decision:
The European Commission accepted commitments involving the divestment of RWE's gas transmission network.
The commitments addressed structural concerns arising from the combination of network control and energy supply activities.
Application to renewable energy platforms:
The principles are relevant where a renewable energy company simultaneously controls:
Electricity transmission or distribution infrastructure.
Renewable electricity generation.
Energy trading platforms.
Project connection arrangements.
If the company uses network control to disadvantage independent renewable energy producers, vertical foreclosure concerns may arise.
Legal significance:
This is an important energy-sector authority demonstrating how control over infrastructure can restrict competition in energy supply markets.
Case 6. E.ON Gas Foreclosure
Citation: European Commission, Case AT.39317, E.ON Gas Foreclosure (2010).
Facts:
E.ON controlled significant gas transportation capacity and had extensive long-term bookings on its gas transmission network.
The European Commission examined whether such bookings restricted access for competing gas suppliers.
Legal issue:
Whether extensive long-term capacity bookings by a dominant energy undertaking could foreclose competing suppliers from accessing important infrastructure.
Decision:
The European Commission accepted commitments requiring E.ON to reduce its long-term bookings of gas transportation capacity.
The objective was to improve access for competing suppliers and facilitate competition in the German gas market.
Application to renewable energy platforms:
A dominant renewable energy platform might reserve excessive grid connection capacity, renewable energy auction slots or electricity transmission capacity.
As a result, independent solar and wind developers may be unable to obtain sufficient capacity to develop their projects.
For example, a dominant operator might reserve grid capacity for affiliated projects even where those projects are not ready for construction.
Such conduct may create artificial scarcity and prevent competitors from entering the market.
Legal significance:
The case illustrates how capacity hoarding and strategic reservation of infrastructure can produce foreclosure effects in energy markets.
Case 7. EDF – Long-Term Electricity Contracts
Citation: European Commission, Case COMP/39.386, Long-Term Electricity Contracts in France (2010).
Facts:
The European Commission investigated EDF's long-term electricity supply arrangements with large industrial consumers in France.
Concerns arose that extensive long-term contracts could restrict customers' ability to obtain electricity from competing suppliers.
Legal issue:
Whether long-term electricity supply arrangements could foreclose competing electricity suppliers by restricting access to customers.
Decision:
The Commission accepted commitments designed to make a substantial portion of electricity demand available to competing suppliers.
Application to renewable energy platforms:
Suppose a dominant renewable energy platform requires electricity purchasers to enter into long-term exclusive arrangements with its affiliated renewable energy producers.
Competing solar and wind developers may consequently lose access to important purchasers.
The arrangement could make market entry difficult even if competing producers offer lower prices or better renewable energy solutions.
Legal significance:
The case demonstrates that long-term contractual arrangements may produce foreclosure effects by restricting access to customers and reducing market contestability.
Case 8. Greek Lignite and Electricity Markets – Commission v. Greece
Citation: Case C-553/12 P, European Commission v. Greece (2014).
Facts:
The dispute concerned the Greek electricity market and the privileged access enjoyed by the Public Power Corporation (PPC) to lignite resources.
PPC held a dominant position in the Greek electricity market.
The European Commission challenged the privileges granted to PPC because they disadvantaged competing electricity producers.
Legal issue:
Whether the grant of privileged access to an important energy resource could distort competition in the downstream electricity market.
Judgment:
The Court addressed the competitive distortion arising from the privileged access to lignite resources and upheld the central competition-law concerns.
Application to renewable energy platforms:
A similar concern could arise if a dominant renewable energy undertaking receives preferential access to:
Publicly controlled renewable energy sites.
Solar and wind project land.
Electricity transmission capacity.
Government-supported procurement opportunities.
Renewable energy development permissions.
If such privileges place competing renewable energy developers at a competitive disadvantage, competition concerns may arise.
Legal significance:
The case is relevant to analysing preferential access to essential energy resources and the resulting distortion of competition in electricity generation.
5. Different Types of Foreclosure in Renewable Energy Project Platforms
A. Vertical foreclosure
Vertical foreclosure occurs when an undertaking operating at one level of the renewable energy supply chain uses its position to restrict competitors operating at another level.
For example, a company controlling electricity transmission may also operate renewable electricity generation projects.
It may provide favourable transmission access to its own projects while delaying access for independent solar and wind developers.
Competition concern: Competitors may be prevented from entering or expanding in the downstream electricity generation market.
Relevant authorities: RWE Gas Foreclosure and E.ON Gas Foreclosure.
B. Horizontal foreclosure
Horizontal foreclosure occurs when a dominant platform restricts competing platforms operating at the same level of the market.
For example, a renewable energy marketplace may prevent independent renewable electricity trading platforms from accessing its network of electricity purchasers.
Competition concern: Competing marketplaces may lose access to customers, producers and commercial opportunities.
Relevant authority: Google Shopping.
C. Customer foreclosure
Customer foreclosure occurs when a dominant platform controls a substantial proportion of renewable electricity purchasers and enters into exclusive purchasing arrangements.
For example, a dominant platform may require industrial consumers to purchase renewable electricity exclusively from its affiliated solar and wind projects.
Independent renewable energy producers may consequently lose access to important customers.
Relevant authority: EDF Long-Term Electricity Contracts.
D. Input foreclosure
Input foreclosure occurs when a dominant undertaking restricts competitors' access to essential inputs.
In renewable energy markets, relevant inputs may include:
Grid connection capacity.
Renewable energy project land.
Electricity balancing services.
Energy storage facilities.
Renewable energy certificates.
Technical project data.
Relevant authorities: Bronner, RWE Gas Foreclosure and E.ON Gas Foreclosure.
E. Data and algorithmic foreclosure
Modern renewable energy platforms increasingly depend on algorithms and digital information.
A dominant platform may control information concerning electricity prices, consumer demand, available renewable energy capacity and project performance.
It may use that information to favour affiliated projects or disadvantage competing developers.
Google Shopping provides a useful analogy for examining preferential treatment within digital platforms.
6. Economic Effects of Renewable Energy Project Platform Foreclosure
Platform foreclosure may produce several negative economic consequences.
| Competition concern | Economic consequence |
|---|---|
| Discriminatory access | Unequal competitive opportunities |
| Exclusive agreements | Reduced market entry |
| Capacity hoarding | Artificial scarcity of grid capacity |
| Self-preferencing | Disadvantage to independent developers |
| Data restrictions | Information asymmetry |
| Customer foreclosure | Reduced access to electricity purchasers |
| Input foreclosure | Increased project development costs |
| Acquisition of competing platforms | Reduced competitive pressure |
A. Reduction in market competition
Independent renewable energy developers may find it difficult to compete against a platform operator that controls essential commercial channels.
B. Increased electricity prices
If competition is reduced, the dominant undertaking may have greater freedom to increase electricity supply prices or platform access charges.
C. Reduced innovation
New renewable energy businesses may be discouraged from developing innovative technologies because they cannot obtain access to procurement platforms, financing or distribution infrastructure.
D. Reduced renewable energy investment
Investors may avoid markets where access to electricity purchasers, grid connections and project opportunities depends on the discretion of a dominant undertaking.
E. Environmental consequences
Foreclosure can indirectly slow the transition towards clean energy.
If independent solar, wind and other renewable energy projects cannot enter the market, the expansion of renewable electricity generation may be delayed.
However, competition law protects the competitive process rather than guaranteeing the success of every renewable energy project.
7. Tests Used by Competition Authorities to Identify Platform Foreclosure
Competition authorities generally examine the following factors.
1. Relevant market definition
The authority must identify the relevant product and geographic market.
Possible relevant markets include:
Renewable electricity generation.
Solar energy project development.
Wind energy project development.
Renewable electricity procurement platforms.
Electricity trading services.
Grid connection and transmission services.
2. Dominance
The authority must determine whether the undertaking possesses substantial market power.
Relevant factors include market share, entry barriers, control over infrastructure, network effects, financial strength and access to essential data.
3. Exclusionary conduct
The authority examines whether the undertaking has engaged in discriminatory access, exclusive dealing, self-preferencing, capacity hoarding, tying or refusal to deal.
4. Foreclosure effects
The authority considers whether the conduct is capable of restricting competitors' access to customers, infrastructure or essential commercial opportunities.
5. Causation
The authority must examine whether the alleged conduct is responsible for the competitive disadvantage rather than assuming that competitors have failed because of the dominant undertaking.
6. Objective justification
The dominant undertaking may establish legitimate reasons for its conduct, including:
Technical safety requirements.
Grid stability.
Electricity system reliability.
Genuine capacity limitations.
Protection of confidential commercial information.
Legitimate investment and infrastructure costs.
Such justifications must be objectively supported and proportionate to the conduct in question.
8. Remedies for Renewable Energy Project Platform Foreclosure
Competition authorities may impose different remedies depending on the nature and seriousness of the infringement.
| Remedy | Explanation |
|---|---|
| Non-discriminatory access | Equal access conditions for competing developers |
| Access regulation | Transparent platform and infrastructure access rules |
| Removal of exclusivity | Elimination of unjustified exclusive arrangements |
| Capacity release | Releasing unused or strategically reserved capacity |
| Data transparency | Fair access to relevant platform information |
| Structural separation | Separation of network and competitive business activities |
| Interoperability | Enabling competing platforms to communicate and operate |
| Behavioural commitments | Monitoring and prohibiting discriminatory practices |
Structural remedies may be particularly important where the same undertaking controls an essential network and competes with businesses dependent upon that network.
The RWE Gas Foreclosure decision illustrates the use of structural commitments, whereas E.ON Gas Foreclosure illustrates the use of capacity-related commitments.
9. Application to Renewable Energy Markets in India
The Indian renewable energy market provides several potential situations in which platform foreclosure may become relevant.
A. Solar energy procurement
Suppose a dominant electricity procurement platform connects solar energy producers with electricity distribution companies.
If the platform systematically favours affiliated solar developers, independent producers may face discriminatory access.
Section 4(2)(a) and Section 4(2)(c) of the Competition Act may become relevant.
B. Wind energy development
Suppose a dominant wind energy project operator controls access to an important project-development platform.
If it imposes exclusive arrangements preventing independent wind developers from obtaining project-related services, competition concerns may arise.
C. Electricity transmission
A transmission undertaking may provide preferential grid connectivity to its affiliated renewable energy projects.
If competing developers experience unjustified delays or discriminatory charges, the conduct may raise denial-of-market-access concerns.
D. Renewable energy auctions
Suppose a digital auction platform controls access to government-supported renewable energy procurement opportunities.
If it provides affiliated developers with preferential bidding information or discriminatory participation conditions, it may distort competition.
E. Renewable energy certificates
A dominant certification or trading platform may restrict access to renewable energy certificates or discriminate against independent market participants.
Such conduct may require examination of the relevant market, dominance and exclusionary effects.
F. Renewable energy project financing
A dominant project financing platform may condition loans on developers purchasing equipment or consultancy services from its affiliated undertakings.
Depending on the circumstances, this could raise tying, bundling and abuse-of-dominance concerns.
Important qualification: These are hypothetical applications of established competition principles, not findings that the described practices have already been held unlawful in India.
10. Relationship Between Platform Foreclosure and Competition Policy
Renewable energy markets require substantial investment, infrastructure and technological innovation.
Competition policy must therefore balance two important objectives:
Preventing dominant undertakings from excluding competitors through unfair platform practices.
Preserving incentives for businesses to invest in renewable energy infrastructure and develop innovative technologies.
The Bronner judgment is particularly important because it recognises the importance of investment incentives when considering compulsory access to privately developed infrastructure.
Similarly, Google Shopping demonstrates that digital platform operators cannot automatically use their dominant position to favour their own services at the expense of competing businesses.
The energy-sector decisions involving RWE, E.ON and EDF demonstrate that control over infrastructure and long-term commercial arrangements can also create substantial foreclosure concerns.
The European Commission's review of energy-sector competition enforcement identifies infrastructure access restrictions, capacity hoarding and long-term capacity bookings as important sources of energy-market foreclosure.
EUR-Lex+2
11. Critical Analysis
Renewable energy project platform foreclosure presents distinctive competition-law challenges.
First, renewable energy markets are highly dependent on infrastructure. Unlike ordinary digital platforms, energy platforms may control physical networks, transmission capacity and electricity balancing facilities.
Second, the renewable energy sector involves significant entry barriers. Developers require land, finance, grid connectivity, regulatory approvals and long-term electricity purchasers.
Third, digital platforms may create network effects. The greater the number of electricity producers and consumers using a platform, the more difficult it may become for competing platforms to attract participants.
Fourth, foreclosure can take place through subtle mechanisms. A dominant platform may not expressly refuse access but may impose discriminatory technical standards, additional fees, delayed approvals or unfavourable ranking algorithms.
Fifth, competition authorities must avoid confusing legitimate business decisions with abusive conduct. A renewable energy platform should not automatically be required to provide free access to competitors or surrender the benefits of its own investment.
Therefore, an effects-based approach is necessary to determine whether the conduct genuinely restricts competition.
12. Conclusion
Renewable Energy Project Platform Foreclosure is an important competition-law issue arising from the increasing digitalisation and vertical integration of renewable energy markets.
A dominant undertaking controlling renewable energy platforms, electricity transmission facilities, procurement mechanisms, project-development networks or digital marketplaces may have the ability and incentive to restrict competitors' access to essential commercial opportunities.
The cases of Bronner, Slovak Telekom, Google Shopping, Lithuanian Railways, RWE Gas Foreclosure, E.ON Gas Foreclosure, EDF Long-Term Electricity Contracts and Commission v. Greece establish important principles concerning refusal of access, discriminatory platform practices, infrastructure foreclosure, capacity hoarding, exclusive contracts and preferential access to energy resources.
Under Indian competition law, Section 4 of the Competition Act, 2002, particularly the provisions concerning unfair conditions, restriction of markets and denial of market access, provides an important legal framework for addressing such conduct.
Ultimately, competition law must ensure that renewable energy platforms facilitate innovation, investment and efficient energy distribution rather than becoming instruments through which dominant undertakings exclude independent renewable energy developers.
13. Summary of Case Laws
| No. | Case | Main competition principle |
|---|---|---|
| 1 | Oscar Bronner v. Mediaprint (1998) | Essential facilities and refusal of access |
| 2 | Slovak Telekom v. Commission (2021) | Discriminatory and restrictive access |
| 3 | Google Shopping v. Commission (2024) | Digital platform self-preferencing |
| 4 | Commission v. Lithuanian Railways (2023) | Infrastructure manipulation and foreclosure |
| 5 | RWE Gas Foreclosure (2009) | Energy infrastructure foreclosure |
| 6 | E.ON Gas Foreclosure (2010) | Capacity hoarding and access restrictions |
| 7 | EDF Long-Term Electricity Contracts (2010) | Customer foreclosure through long-term contracts |
| 8 | Commission v. Greece (2014) | Preferential access to energy resources |
The first four are judicial judgments. The next three are European Commission competition decisions, and the eighth is a Court of Justice judgment. This distinction is important when citing these authorities in academic or legal writing.
Overall legal proposition: A renewable energy platform's dominance is not unlawful by itself. The competition-law concern arises when the undertaking abuses that position through exclusionary, discriminatory or otherwise anti-competitive conduct that restricts effective competition in the relevant market.

comments